
The elevator excavator, which had been working on the cable trenches for the Rampion Offshore Wind Farm, has been stuck in the water for more than a week.
The elevator excavator, which had been working on the cable trenches for the Rampion Offshore Wind Farm, has been stuck in the water for more than a week.