Former Lewes High Street bank could become three-bedroom house if new application gets green light

A former Lewes bank could be converted into a three-bedroom house if an application is approved by South Downs National Park Authority.

Application SDNP/26/01197/FUL proposes changing the old HSBC at 63 High Street from Class E(c)(i) (financial services) into a self-contained dwelling (class C3).

People can view the application documents at planningpublicaccess.southdowns.gov.uk.

The design statement is by Elemental Architecture & Design on behalf of Matsim Properties.

The former HSBC at 63 High Street in Lewes could be converted into a three-bedroom house. Photo: Google Street Viewplaceholder image
The former HSBC at 63 High Street in Lewes could be converted into a three-bedroom house. Photo: Google Street View

It said: “A separate application was submitted for a part conversion to residential (SDNP/25/04324/FUL), but this application is now deemed commercially unviable.”

The design statement said this new application addresses heritage concerns ‘for the retention and enhancement’ of the features of the unlisted building, adding that the proposal is now commercially able to support the enhancements.

It said: “It is now believed that the building may have been designed by Sir Edwin Lutyens who was Midland Bank Architect during the period of construction. The fibrous plaster ceiling, wooden wall panelling, marble and parquet floor coverings are to be preserved. Due to the single access door, the only way to preserve the banking hall features is conversion into a single dwelling house.”

It said the proposals would result in ‘minimal change’ to the exterior of the building. The development proposals include: internal works to provide a three-bedroom house; a bedroom, en-suite, bike store and bin/recycling store at lower ground floor level; and a bedroom, kitchen, living/dining room at ground floor level. The first floor would provide a bedroom and W/C, as well as a new stair to a proposed roof terrace above.

The design statement conclusion said this new application would bring the high street building back into use after being empty for nearly three years. It said: “We therefore believe the proposals to be sympathetic to their location, visually pleasing and beneficial to the use of the land and are in accordance with the relevant planning policies.”

Related topics:
Follow us
© 2026 Iconic Media Group Ltd. All rights reserved.Cookie SettingsTerms and ConditionsPrivacy notice