Evening work on line until April ‘at least’

Part of the railway line between Hastings and London Charing Cross will close for two evenings a week for at least four months due to major engineering works.
SUS-150212-142312001SUS-150212-142312001
SUS-150212-142312001

Network Rail is about to begin a programme of improvement work to the line between Tonbridge and Hastings.

Engineers will replace old components and rail and carry out vital maintenance on the earthworks and signalling systems.

Hide Ad
Hide Ad

However, it will mean changes to train services on Monday and Tuesday late evenings from December 14.

Trains leaving London and Hastings after 9pm on these days will be replaced by buses between Tonbridge, Tunbridge Wells and Wadhurst.

Network Rail said the work is open-ended, but would ongoing until at least April.

Route managing director for the south east, Alasdair Coates, said: “To keep trains running reliably we have to continue with our Railway Upgrade Plan to replace worn-out track and other equipment, but we also know that passengers want to travel by train on a Saturday and Sunday.

Hide Ad
Hide Ad

“We have worked with Southeastern on a plan to continue our improvement work on the Hastings line overnight on Mondays and Tuesdays, when evening trains are at their quietest – and considerably quieter than at weekends.

“There is no good time to do this work and it is almost impossible to do so without impacting on passengers – however I’m confident that this plan will keep the railway open as long as possible, while also improving journeys for everybody.”

Richard Dean, train services director at Southeastern, said: “We appreciate this will inconvenience those who travel on this line after 9pm on a Monday or Tuesday evening and we apologise for that, but this will impact on a much lesser number of passengers than if this happened on a Saturday or Sunday. Bus replacement services will be in place during these times and we would urge passengers to leave extra time for their journeys.” For train times, see www.nationalrail.co.uk

* Don’t miss out on all the latest breaking news where you live.

Hide Ad
Hide Ad

Here are four ways you can be sure you’ll be amongst the first to know what’s going on.

1) Make our website your homepage

2) Like our Facebook page

3) Follow us on Twitter

4) Register with us by clicking on ‘sign in’ (top right corner). You can then receive our daily newsletter AND add your point of view to stories that you read here.

And do share with your family and friends - so they don’t miss out!

Always the first with your local news.

Be part of it.