The post officer frontage on Cambridge road has been cordoned off while construction work takes place. The impressive looking post office building was built in 1930 and was the town’s main post office and local landmark for eight decades until it was re-located into W H Smiths in Queens Road in 2014.
The old building contains a memorial to Hastings postal workers that lost their lives in the two world wars.
Council planners gave the go-ahead for the former Post Office building and University of Brighton site in Hastings town centre to be turned into flats in 2025, after Stonegate Homes (Hastings) Ltd submitted an application to turn it into 41 apartments.
Developers said the ground floor of the Post Office building will be returned to commercial use.
The plans involve building a single-storey mansard roof extension above the former post office at fourth floor level and the building of a single-storey roof extension above the former university site at fifth floor level for residential use.
A mansard roof extension involves modifying the upper portion of a building to create additional living space by altering the roof into a steeply sloped structure with windows.
The Priory Square building was built in 2013 but has stood vacant for a number of years after its intended educational use failed.
The University of Brighton closed the Priory Square building and its other two sites in town in 2019. The Hastings campus opened in 2003 and received £12m of public investment.

5. Building work underway in Cambridge Road
Building work underway in Cambridge Road Photo: staff

6. Work underway at the old post officer building in Cambridge Road
Work underway at the old post officer building in Cambridge Road Photo: staff

