Political opinion: Wealden's choice - a local plan or no control at all
See the latest news from Your World at https://www.sussexexpress.co.uk/your-world
Ahead of Friday’s vote on whether to take the draft Local Plan into Regulation 19 consultation, Alliance for Wealden sets out why the real choice is not ‘development or no development’, but ‘controlled development or uncontrolled development'


Full Council meets on Friday 18 September 2026, preceded by a special Cabinet meeting, to decide whether to take Wealden’s draft Local Plan into Regulation 19, the next stage of statutory public consultation before the plan is submitted for independent examination. Ahead of that vote, the Alliance for Wealden (comprising the Green, Liberal Democrat and Labour groups, and an Independent councillor), which leads Wealden District Council, has set out why it is recommending the draft plan for approval.
Cllr Rachel Millward, Leader of Wealden District Council, on behalf of the Alliance for Wealden (Green), said: “It is vital that residents understand that the choice facing the district is not whether new homes and employment sites get built, but who controls where, and how well.
We cannot, within the reality of the government’s planning system, design the Wealden of our dreams, or even deliver enough social housing to meet local need. But we are determined, within that flawed system, to ensure the best possible outcomes for our communities, now and in the future. We have deliberately focused on policies which reflect our vision of Wealden as a place where people and nature thrive together — stronger protection for nature, less water and energy use in every new build, and more of the smaller homes that local people actually need.”
Cllr James Partridge, Deputy Leader of Wealden District Council (Liberal Democrats), commented: “Without a Local Plan, planning decisions default to a housing number set centrally by government, with none of the local safeguards, design standards or infrastructure requirements a plan can put in place. A Local Plan lets us limit the number and location of sites, insist on higher design and sustainability standards, and require infrastructure to be delivered alongside growth, not after it. It won’t fix a broken planning system, but within that flawed system, it’s the only way we have to secure some control — to refuse speculative development, demand better design and standards, and hold infrastructure providers to account.”
Cllr Ian Tysh, Cabinet Member for Planning and Environment (Green), added: “Our role has been to assess the suitability of every site submitted to us, against the government’s own criteria. Get the draft policies in place, and what gets built will be better quality, with nature better protected, and in places even enhanced. What we are determined to avoid is a government, or mayoral, override of local decision-making, which would ride roughshod over our mission to make Wealden greener, fairer and kinder for this and future generations.”
Regulation 19 is the formal ‘publication’ stage of the process, the version of the plan the council intends to submit for examination unless significant changes are needed. Subject to Full Council’s agreement on 18 September, it will be a key opportunity for residents, businesses and other stakeholders to have their say before that submission.
What the draft Local Plan for Wealden delivers:
Taking back control of when and where new homes get built, by breaking from the government’s standard method for calculating housing need.
Proposing 6,700 fewer homes than the government’s target, a figure equivalent to 71% of it.
Building more smaller homes with fewer bedrooms that local people actually need, not more executive enclaves.
A significant number of new affordable homes, including many more at social rent.
High construction standards that mitigate and adapt to climate change.
High design standards, including space standards and adaptations for people with mobility needs.
The maximum possible protection of the countryside.
The maximum possible protection and restoration of nature.
The maximum possible protection of Wealden’s heritage.
No occupation of new homes without the infrastructure to support them.
Protection of sites for future community assets, such as a reservoir and the railway.
Support for our economy, including high streets and rural businesses.
Helping the incoming mayoral authority understand the constraints that apply to our place.